MDT 5 Smart Factory over MEC: Difference between revisions

From MECwiki
Jump to: navigation, search
(Created page with "== MDT Team == * SK telecom * MyungWha corporation == Main Contact == SK telecom [mailto:Hyeonsoo Lee] == MDT Proposal == [https://docbox.etsi.org/ISG/MEC/05-CONTRIBUTIO...")
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
<br>
<p class="left" style="font-size:26px;"> ←''[[Ongoing_MDTs|Ongoing MDTs]]''<p>
<br>
== MDT Team ==
== MDT Team ==


Line 7: Line 10:
== Main Contact ==
== Main Contact ==


SK telecom [mailto:Hyeonsoo Lee]
SK telecom [mailto:hyeonsoo.lee@sk.com]


== MDT  Proposal ==
== MDT  Proposal ==
[https://docbox.etsi.org/ISG/MEC/05-CONTRIBUTIONS/2021//MEC(21)000262_MDT_Proposal_SmartFactory.doc Smart Factory over MEC]
[//docbox.etsi.org/ISG/MEC/05-CONTRIBUTIONS/2021//MEC(21)000262_MDT_Proposal_SmartFactory.doc Smart Factory over MEC]


== MDT Topics ==
== MDT Topics ==

Latest revision as of 18:39, 26 March 2024


Ongoing MDTs


MDT Team

  • SK telecom
  • MyungWha corporation


Main Contact

SK telecom [1]

MDT Proposal

Smart Factory over MEC

MDT Topics

This MDT is WORKING on:

Technical reports describing POC results in Smart Factory scenario

MDT Report

MDT Report is expected by Q3 2021