PoC Framework: Difference between revisions

From MECwiki
Jump to: navigation, search
(32 intermediate revisions by 3 users not shown)
Line 2: Line 2:


= MEC PoC Framework Document =
= MEC PoC Framework Document =
The MEC PoC Framework GS can be downloaded from:
The MEC Proof of Concept (PoC) Framework GS describes the full ISG MEC PoC activity process, roles, responsibilities, acceptance criteria, etc...


[http://docbox.etsi.org/ISG/MEC/ieg/70-Draft/IEG5/MEC-IEG005v030.docx - Word version (final draft for approval)].
The latest version of this document can be downloaded here: [[Media: Gs_MEC-IEG005v010102.pdf | MEC PoC Framework]].
 
For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.


= Templates =
= Templates =


[[Media:MEC_PoC_proposal_template.doc | MEC PoC Proposal Template (word)]]
[[Media:MEC_PoC_proposal_template v2.doc | MEC PoC Proposal Template (word)]]
 
[[Media:MEC_PoC_report_template v2.doc | MEC PoC Report Template (word)]]
 
= PoC Topics =
 
PoC Projects are expected to be scoped arround PoC Topics identified and agreed by ISG MEC. [[PoC Topics|See details and current list of PoC Topics]].


[[Media:MEC_PoC_report_template.doc | MEC PoC Report Template (word)]]
= Submitting a PoC Proposal =
# The PoC Team fills in the PoC Proposal template
# The PoC Team uploads the completed proposal to the ETSI portal as a contribution to MEC
# The PoC Team sends an email to the [mailto:ISG_MEC@list.etsi.org MEC mailing list] containing the link to the proposal


= Acceptance Criteria =
= Acceptance Criteria =
The PoC Proposals shall fulfill the following acceptance criteria:
* The PoC Proposal will follow the PoC Proposal Template
* The PoC Proposal will follow the PoC Proposal Template
# The PoC Team will have at a minimum 3 different organizations:
* The PoC Team will have at a minimum 3 different organizations:
## at least one network operator;
** at least one network operator;
## at least one infrastructure provider;
** at least one infrastructure provider;
## at least one content/application provider.
** at least one content/application provider.
# The PoC Point of Contact will be an ISG MEC Member or ISG MEC Participant.
* The PoC Point of Contact will be an ISG MEC Member or ISG MEC Participant.
# The PoC Proposal will address at least one of the PoC topics listed on the MEC Wiki.
* The PoC Proposal will address at least one of the PoC topics listed on the MEC Wiki.
# The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, ISG MEC meeting, a related conference, or other events
* The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, ISG MEC meeting, a related conference, or other events


= CTI support =
= CTI support =

Revision as of 12:56, 12 April 2017

MEC PoC Framework Document

The MEC Proof of Concept (PoC) Framework GS describes the full ISG MEC PoC activity process, roles, responsibilities, acceptance criteria, etc...

The latest version of this document can be downloaded here: MEC PoC Framework.

For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.

Templates

MEC PoC Proposal Template (word)

MEC PoC Report Template (word)

PoC Topics

PoC Projects are expected to be scoped arround PoC Topics identified and agreed by ISG MEC. See details and current list of PoC Topics.

Submitting a PoC Proposal

  1. The PoC Team fills in the PoC Proposal template
  2. The PoC Team uploads the completed proposal to the ETSI portal as a contribution to MEC
  3. The PoC Team sends an email to the MEC mailing list containing the link to the proposal

Acceptance Criteria

The PoC Proposals shall fulfill the following acceptance criteria:

  • The PoC Proposal will follow the PoC Proposal Template
  • The PoC Team will have at a minimum 3 different organizations:
    • at least one network operator;
    • at least one infrastructure provider;
    • at least one content/application provider.
  • The PoC Point of Contact will be an ISG MEC Member or ISG MEC Participant.
  • The PoC Proposal will address at least one of the PoC topics listed on the MEC Wiki.
  • The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, ISG MEC meeting, a related conference, or other events

CTI support

The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.

MEC PoC Teams may request CTI assistance by contacting ETSI CTI.

About ISG MEC

ISG MEC is creating a standardized, open environment which will allow the efficient and seamless integration of applications from vendors, service providers, and third-parties across multi-vendor Mobile-edge Computing platforms.

ISG MEC has developed a MEC PoC Framework to coordinate and promote multi-vendor Proofs of Concept illustrating key aspects of the ISG MEC work.

Learn more about ISG MEC