PoC Topics: Difference between revisions

From MECwiki
Jump to: navigation, search
Line 19: Line 19:
| Q4 2016  
| Q4 2016  
|-
|-
| '''[[PT02 - ]]'''
| '''[[PT02 - MEC Metrics]]'''
| <span style="color:green;">'''Active'''</span>
| <span style="color:green;">'''Active'''</span>
| []
| [https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=47908 MEC-IEG006]
| Technical Report
| Technical Report
| Q4 2016  
| Q4 2016  
|-
|-
| '''[[PT03 - ]]'''
| '''[[PT03 - MEC Architecture]]'''
| <span style="color:green;">'''Active'''</span>
| <span style="color:green;">'''Active'''</span>
| []
| [https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=46046 MEC003]
| Technical Report
| Technical Report
| Q4 2016  
| Q4 2016  

Revision as of 14:15, 13 January 2016

Rationale

MEC PoC Topics are specific areas, often linked to a Work Item, where input or feedback from the MEC Proofs of Concept is needed. MEC PoC Topics help to focus PoC Projects on the most relevant topics for the ISG MEC, and to increase the relevance of their contributions.

MEC PoC Topics are identified and documented by ISG MEC. MEC PoC Topics may include templates for the PoC Contributions and deadlines to ensure that the PoC Contributions arrive on-time to be taken into account by the targeted WIs.

MEC PoC Topics

PoC Topic Status WI(s) PoC Feedback Deadline
PT01 - Demonstration of MEC Service Scenarios Active MEC-IEG004 Technical Report Q4 2016
PT02 - MEC Metrics Active MEC-IEG006 Technical Report Q4 2016
PT03 - MEC Architecture Active MEC003 Technical Report Q4 2016

Addressing a PoC Topic in a PoC Project

PoC Teams specify the targeted PoC Topic(s) in their PoC Proposal, and commit to provide the expected input or feedback in the requested format (template, if applicable) in a timely manner.

Feeding back the results

As soon as experimental results relevant for a given MEC PoC Topic are available (no need to wait for the PoC Project to be completed), the PoC Team creates a contribution and informs the ISG MEC by email (if the PoC Topic had a specific template for feedback contributions, it should be used). PoC Teams are also encouraged to contribute additional results and lessons learned during the PoC Project to the ISG MEC.