PoC 13 MEC infotainment for smart roads and city hot spots: Difference between revisions
From MECwiki
No edit summary |
No edit summary |
||
(9 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
<p class="left" style="font-size:26px;"> ←''[[Ongoing_PoCs|Ongoing PoCs]]''<p> | |||
<br> | |||
< | |||
== PoC Team == | == PoC Team == | ||
* TIM | * TIM | ||
Line 23: | Line 17: | ||
4G/5G infotainment services are seamlessly provided both to car drivers/passengers and to pedestrians in smart roads and city hot spots (e.g., commercial areas, Stadium, Stations, during events/concerts etc). | 4G/5G infotainment services are seamlessly provided both to car drivers/passengers and to pedestrians in smart roads and city hot spots (e.g., commercial areas, Stadium, Stations, during events/concerts etc). | ||
<p></p> | |||
[[File:Poc13.png|center|600x600px|link=PoC_13_MEC_infotainment_for_smart_roads_and_city_hot_spots]] | |||
== PoC Proposal == | == PoC Proposal == | ||
[ | [//mecwiki.etsi.org/images/PoC_13_MEC_infotainment_for_smart_roads_and_city.docx MEC infotainment for smart roads and city hot spots] | ||
== PoC Topics == | == PoC Topics == | ||
This PoC is | This PoC is working on: | ||
[[PT01 - Demonstration of MEC Service Scenarios]] | [[PT01 - Demonstration of MEC Service Scenarios]] |
Latest revision as of 18:16, 26 March 2024
PoC Team
- TIM
- Intel
- Vivida
- ISMB
- City of Turin
Main Contact
Antonio Manzalini, TIM antonio.manzalini@telecomitalia.it
Abstract
The use case aims at demonstrating innovative 4G/5G infotainment services for both pedestrians and car drivers/passengers in smart roads and city hot spots.
4G/5G infotainment services are seamlessly provided both to car drivers/passengers and to pedestrians in smart roads and city hot spots (e.g., commercial areas, Stadium, Stations, during events/concerts etc).
PoC Proposal
MEC infotainment for smart roads and city hot spots
PoC Topics
This PoC is working on:
PT01 - Demonstration of MEC Service Scenarios
PT04 - PT04 MEC enabled vertical segments applications
PoC Report
PoC Report is expected by end of Q4 2019