PoC 4 FLIPS – Flexible IP-based Services: Difference between revisions
(Created page with "== PoC Team == InterDigital Bristol is Open Intracom CVTC Essex University == Main Contact == Alex Reznik, Interdigital [mailto:alex.reznik@interdigital.com alex.reznik@i...") |
|||
Line 27: | Line 27: | ||
== PoC Proposal == | == PoC Proposal == | ||
[https://docbox.etsi.org/ISG/MEC/IEG/05-CONTRIBUTIONS/2016//MECIEG(16)000001r2_POC_Proposal__FLIPS__Flexible_IP-Based_Services.docx MECIEG(16)000001r2_POC_Proposal__FLIPS__Flexible_IP-Based_Services.docx] | [https://docbox.etsi.org/ISG/MEC/IEG/05-CONTRIBUTIONS/2016//MECIEG(16)000001r2_POC_Proposal__FLIPS__Flexible_IP-Based_Services.docx MECIEG(16)000001r2_POC_Proposal__FLIPS__Flexible_IP-Based_Services.docx] | ||
''' | |||
Updated proposal (22/03/2016):''' [https://docbox.etsi.org/ISG/MEC/IEG/05-CONTRIBUTIONS/2016//MECIEG(16)000001r2_POC_Proposal__FLIPS__Flexible_IP-Based_Services.docx MECIEG(16)000001r2_POC_Proposal__FLIPS__Flexible_IP-Based_Services.docx] | |||
== PoC Topics == | == PoC Topics == |
Revision as of 14:42, 22 March 2016
PoC Team
InterDigital
Bristol is Open
Intracom
CVTC
Essex University
Main Contact
Alex Reznik, Interdigital alex.reznik@interdigital.com
Dirk Trossen, Interdigital mailto:dirk.trossen@interdigital.com
PoC Demo
PoC Demo 1 - MWC Barcelona, Spain, Feb 2016
PoC Demo 2 - PoC Live Demo using Bristol Is Open network, Bristol, UK, May 2016
PoC Demo 3 - MEC World Congress, Munich (GE), Sept 2016
Abstract
An operator-based MEC Application is designed to transparently accelerate delivery of IP-based content and streaming media. This Application additionally allows exposure of in-network surrogate server to allow operators to offer Surrogate-as-a-Service for web-based media delivery.
PoC Proposal
MECIEG(16)000001r2_POC_Proposal__FLIPS__Flexible_IP-Based_Services.docx Updated proposal (22/03/2016): MECIEG(16)000001r2_POC_Proposal__FLIPS__Flexible_IP-Based_Services.docx
PoC Topics
This PoC is WORKING on:
PT01 - Demonstration of MEC Service Scenarios
PoC Contribution to PT01 and PT02 (Technical Report) is expected by Q4 2016
PoC Report
PoC Report is expected by Q4 2016