PT02 - MEC Metrics: Difference between revisions

From MECwiki
Jump to: navigation, search
(Created page with "= Description = Identify valuable and measurable MEC metrics that demonstrate the technical and business benefits of the MEC solutions in some use cases. Demonstrate the ident...")
 
No edit summary
 
(4 intermediate revisions by one other user not shown)
Line 3: Line 3:
Demonstrate the identified MEC Metrics as drafted within the current DGS MEC-IEG006.  
Demonstrate the identified MEC Metrics as drafted within the current DGS MEC-IEG006.  


 
[https://docbox.etsi.org/ISG/MEC/05-CONTRIBUTIONS/2015//MEC(15)000272r2_Hot_PoC_Topic_Proposal.docx MEC PoC Topic Proposal - MEC Metrics]
[https://docbox.etsi.org/ISG/MEC/05-CONTRIBUTIONS/2015//MEC(15)000272r2_Hot_PoC_Topic_Proposal.docx MEC PoC Topic 02 - MEC Metrics]


= Status =
= Status =
Line 30: Line 29:
=Concerned WGs/WI=  
=Concerned WGs/WI=  
• GS MEC-IEG006 Mobile Edge Computing (MEC); MEC Metrics ([https://portal.etsi.org/tb.aspx?tbid=835&SubTB=835 See latest draft])
• GS MEC-IEG006 Mobile Edge Computing (MEC); MEC Metrics ([https://portal.etsi.org/tb.aspx?tbid=835&SubTB=835 See latest draft])


=Coordinator=
=Coordinator=
MEC-IEG006 Rapporteur: Milan Patel (Huawei) ([mailto:milan.patel@huawei.com  milan.patel@huawei.com])
CTI Support: [mailto:cti_support@etsi.org cti_support@etsi.org]
CTI Support: [mailto:cti_support@etsi.org cti_support@etsi.org]
=Contributions (feedback) deadline=
Q4 2016

Latest revision as of 08:42, 7 July 2022

Description

Identify valuable and measurable MEC metrics that demonstrate the technical and business benefits of the MEC solutions in some use cases. Demonstrate the identified MEC Metrics as drafted within the current DGS MEC-IEG006.

MEC PoC Topic Proposal - MEC Metrics

Status

ACTIVE

What is expected to be learnt from the PoCs

Points to prove/refute

• Valuable and measureable additional MEC Metrics that demonstrate the benefits of MEC in some use cases

• Demonstrate that the identified MEC Metrics are measurable

Criterion of success

• KPI/Metrics that are contributed to the draft GS MEC-IEG006

Other information

• Proposed measured metric value ranges with additional detailed description under what conditions they have been measured

Technical information to be provided by the PoC Team

The identified MEC Metrics are either described by the current draft or will be provided by the PoC Team as input contributions to the IEG WG meetings.

Template for the PoC Feedback Contribution

No specific template. POC Teams are expected to submit a Technical Report covering the points mentioned above.

Concerned WGs/WI

• GS MEC-IEG006 Mobile Edge Computing (MEC); MEC Metrics (See latest draft)

Coordinator

CTI Support: cti_support@etsi.org