MEC testing: Difference between revisions

From MECwiki
Jump to: navigation, search
No edit summary
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
__TOC__
__TOC__
== Methodology ==
=== Methodology ===
* [https://www.etsi.org/deliver/etsi_gr/MEC-DEC/001_099/025/02.01.01_60/gr_MEC-DEC025v020101p.pdf '''Testing Framework''']: Methodology, guidelines and framework
* [//www.etsi.org/deliver/etsi_gr/MEC-DEC/001_099/025/02.01.01_60/gr_MEC-DEC025v020101p.pdf '''Testing Framework''']: Methodology, guidelines and framework
<br>
<br>
== API Conformance Testing ==  
=== API Conformance Testing ===  
* '''API Conformance Test Suites'''
* '''API Conformance Test Suites'''
** [https://forge.etsi.org/rep/mec/gs032p2-test-purposes '''Test Purposes''']
** [//forge.etsi.org/rep/mec/gs032p2-test-purposes '''Test Purposes''']
** [https://forge.etsi.org/rep/mec/gs032p3-ttcn-test-suite '''TTCN-3''']: Testing and Test Control Notation version 3 testing language
** [//forge.etsi.org/rep/mec/gs032p3-ttcn-test-suite '''TTCN-3''']: Testing and Test Control Notation version 3 testing language
** [https://forge.etsi.org/rep/mec/gs032p3-robot-test-suite '''Robot Framework''']
** [//forge.etsi.org/rep/mec/gs032p3-robot-test-suite '''Robot Framework''']
<br>
<br>
== Interoperability Testing  ==
=== Interoperability Testing  ===
* '''Interoperability Test plan'''
* '''Interoperability Test plan'''
** [https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/MEC_Plugtests_Test_Plan.pdf '''MEC Plugtests 2021 Test Plan V1.1''']
** [//www.etsi.org/deliver/etsi_gr/MEC-DEC/001_099/042/03.01.01_60/gr_MEC-DEC042v030101p.pdf '''Guidelines on Interoperability testing GR MEC-DEC042''']
 
<br>
<br>
* '''ETSI Plugtests events'''
* '''ETSI Plugtests events'''
** NFV&MEC IOP 2021 Plugtests
ETSI organized the NFV&MEC IOP Plugtests 2021 event from 1 to 15 October 2021. A total of '''29 organization'''s and over '''75 engineers''' were involved in the preparation of this 2 weeks event forming an engaged and diverse community of implementers testing together over 25 NFV and MEC solutions, such as Virtual and Containerized Network Functions (VNFs), Management and Orchestration solutions, NFV Infrastructure, as well as MEC Platforms, Systems and Applications.


** NFV&MEC IOP 2021 Plugtests
The Report of this multi-vendor interoperability (IOP) event is available '''[//portal.etsi.org/Portals/0/TBpages/CTI/Docs/ETSI_NFV&MEC_IOP_2021_Plugtests_Report_v1_0_0.pdf here]'''
ETSI organized the NFV&MEC IOP Plugtests 2021 event from 1 to 15 October 2021. The Report of this multi-vendor interoperability (IOP) event is available [https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/ETSI_NFV&MEC_IOP_2021_Plugtests_Report_v1_0_0.pdf '''here''']


see Press Release of the event on [https://www.etsi.org/newsroom/news/2000-2021-11-etsi-nfv-and-mec-iop-plugtests-report-2021-published ETSI web]
see Press Release of the event on [//www.etsi.org/newsroom/news/2000-2021-11-etsi-nfv-and-mec-iop-plugtests-report-2021-published ETSI web]
<div style="width:40%; min-width: 100px; padding:20px;float:left; font-size:12pt">
<div style="width:40%; min-width: 100px; padding:20px;float:left; font-size:12pt">

Latest revision as of 16:59, 26 March 2024

Methodology


API Conformance Testing


Interoperability Testing


  • ETSI Plugtests events
    • NFV&MEC IOP 2021 Plugtests

ETSI organized the NFV&MEC IOP Plugtests 2021 event from 1 to 15 October 2021. A total of 29 organizations and over 75 engineers were involved in the preparation of this 2 weeks event forming an engaged and diverse community of implementers testing together over 25 NFV and MEC solutions, such as Virtual and Containerized Network Functions (VNFs), Management and Orchestration solutions, NFV Infrastructure, as well as MEC Platforms, Systems and Applications.

The Report of this multi-vendor interoperability (IOP) event is available here

see Press Release of the event on ETSI web