PoC Framework: Difference between revisions

From MECwiki
Jump to: navigation, search
No edit summary
 
(50 intermediate revisions by 3 users not shown)
Line 1: Line 1:
__TOC__
__TOC__


= NFV ISG PoCs =
== MEC PoC Framework Document ==
NFV ISG has developed an NFV PoC Framework to coordinate and promote multi-vendor Proofs of Concept illustrating key aspects of NFV ISG work.  
The MEC Proof of Concept (PoC) Framework GS describes the full ISG MEC PoC activity process, roles, responsibilities, acceptance criteria, etc...


[http://www.etsi.org/technologies-clusters/technologies/nfv/nfv-poc Learn more about NFV ISG PoCs]
The latest version of this document can be downloaded here: [[Media: Gs_MEC-IEG005v010102.pdf | MEC PoC Framework]].


= Framework Document =
For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.
The PoC Framework document can be downloaded at:


[http://www.etsi.org/deliver/etsi_gs/NFV-PER/001_099/002/01.01.01_60/gs_NFV-PER002v010101p.pdf NFV-PER002-PoC Framework - pdf version].
== Templates ==


[http://webapp.etsi.org/exchangefolder/gs_NFV-PER002v010101p.zip NFV-PER002-PoC Framework - Word version].
[[Media:MEC_PoC_proposal_template v2.doc | MEC PoC Proposal Template (word)]]


You'll find the templates for PoC Proposals and PoC Reports at the end of those documents.
[[Media:MEC_PoC_report_template v2.doc | MEC PoC Report Template (word)]]


= Q&A =
== PoC Topics ==
See below some usual questions about the NFV ISG PoCs:


'''I would like to submit a POC proposal where can I find a Word version of the template?'''
PoC Projects are expected to be scoped arround PoC Topics identified and agreed by ISG MEC. [[PoC Topics|See details and current list of PoC Topics]].
You can find a link to the word version of the PoC Framework (including the templates) at:
[http://webapp.etsi.org/exchangefolder/gs_NFV-PER002v010101p.zip NFV-PER002-PoC Framework - Word version]


'''Do all of the POC participants have to be NFV ISG participants?'''
== Submitting a PoC Proposal ==
No, it is only required that (at least) one of the supporting Network Operators or Service Providers
# The PoC Team fills in the PoC Proposal template
is member of the NFV ISG. See Section 4.5 of the PoC Framework:
# The PoC Team uploads the completed proposal to the ETSI portal as a contribution to MEC
 
# The PoC Team sends an email to the [mailto:ISG_MEC@list.etsi.org MEC mailing list] containing the link to the proposal
''“4.5 NFV ISG PoC Proposal Acceptance Criteria ''
''The criteria for acceptance of NFV ISG PoC Proposals are: ''
[...]
''2) The organizations participating in an PoC Project shall include at least two Manufacturers and at''
''least one Network Operator or one Service Provider, where at least the one Network Operator or the one  ''
''Service Provider shall be a member of the NFV ISG (refer clause A.1.1). “''


'''Where do I send the completed proposal?'''
== Acceptance Criteria ==
Once your proposal completed, you need to:
The PoC Proposals shall fulfill the following acceptance criteria:
1) upload it to the ETSI portal as a regular contribution
* The PoC Proposal will follow the PoC Proposal Template
2) send an email to NFV_POC@LIST.ETSI.ORG with [NFV ISG PoC Proposal] in the subject line and a link to
* The PoC Team will have at a minimum 3 different organizations:
the uploaded contribution included in the body. To be able to post your email, you will need to subscribe
** at least one network operator;
to that list if not already done. See section 4.3 of the PoC Framework:
** at least one infrastructure provider;
** at least one content/application provider.
''“4.3 NFV ISG PoC Proposal Submission
* The PoC Point of Contact will be an ISG MEC Member or ISG MEC Participant.
''PoC Team formation is beyond the scope of the NFV ISG. The PoC Team shall prepare an NFV ISG PoC Proposal ''
* The PoC Proposal will address at least one of the PoC topics listed on the MEC Wiki.
''according to the NFV ISG PoC Proposal template in clause A.1. The PoC Proposal shall be submitted to the''
* The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, ISG MEC meeting, a related conference, or other events
''ISG as a contribution uploaded on the ETSI Portal and a link to the contribution shall be sent to the ''
''dedicated e-mail distribution list ‘NFV_POC@LIST.ETSI.ORG' with [NFV ISG PoC Proposal] in the subject ''
''line.”''


= ETSI CTI Support =
== CTI support ==
The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.


The ETSI Center for Testing and Interoperability (CTI) has experience in supporting the organization of technology evaluations and interoperability events (in many ways similar to PoCs).
MEC PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=MEC_PoC-Support_Request contacting ETSI CTI].


This experience may be useful to assist the PoC teams with test expertise, administration and project management support.  
== About ISG MEC ==
ISG MEC is creating a standardized, open environment which will allow the efficient and seamless integration of applications from vendors, service providers, and third-parties across multi-vendor Mobile-edge Computing platforms.


NFV ISG PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=NFV_ISG_PoC-Support_Request contacting ETSI CTI].
ISG MEC has developed a MEC PoC Framework to coordinate and promote multi-vendor Proofs of Concept illustrating key aspects of the ISG MEC work.  


= About NFV ISG =
[http://www.etsi.org/technologies-clusters/technologies/mec Learn more about ISG MEC]
Learn more [http://www.etsi.org/technologies-clusters/technologies/nfv about NFV at ETSI ]

Latest revision as of 15:16, 7 December 2021

MEC PoC Framework Document

The MEC Proof of Concept (PoC) Framework GS describes the full ISG MEC PoC activity process, roles, responsibilities, acceptance criteria, etc...

The latest version of this document can be downloaded here: MEC PoC Framework.

For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.

Templates

MEC PoC Proposal Template (word)

MEC PoC Report Template (word)

PoC Topics

PoC Projects are expected to be scoped arround PoC Topics identified and agreed by ISG MEC. See details and current list of PoC Topics.

Submitting a PoC Proposal

  1. The PoC Team fills in the PoC Proposal template
  2. The PoC Team uploads the completed proposal to the ETSI portal as a contribution to MEC
  3. The PoC Team sends an email to the MEC mailing list containing the link to the proposal

Acceptance Criteria

The PoC Proposals shall fulfill the following acceptance criteria:

  • The PoC Proposal will follow the PoC Proposal Template
  • The PoC Team will have at a minimum 3 different organizations:
    • at least one network operator;
    • at least one infrastructure provider;
    • at least one content/application provider.
  • The PoC Point of Contact will be an ISG MEC Member or ISG MEC Participant.
  • The PoC Proposal will address at least one of the PoC topics listed on the MEC Wiki.
  • The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, ISG MEC meeting, a related conference, or other events

CTI support

The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.

MEC PoC Teams may request CTI assistance by contacting ETSI CTI.

About ISG MEC

ISG MEC is creating a standardized, open environment which will allow the efficient and seamless integration of applications from vendors, service providers, and third-parties across multi-vendor Mobile-edge Computing platforms.

ISG MEC has developed a MEC PoC Framework to coordinate and promote multi-vendor Proofs of Concept illustrating key aspects of the ISG MEC work.

Learn more about ISG MEC