PoC 15 Remote maintenance for logistics: Difference between revisions

From MECwiki
Jump to: navigation, search
(Created page with " == PoC Team == * China Telecom * China Telecom Intelligent NETWORK Technology Co., LTD * Huawei == Main Contact == Hongmei Zhu , China Telecom , [mailto:zhuhongm@chinatelecom.cn zhuhongm@chinatelecom.cn] == Abstract == This PoC proposal describes the 5G distributed MEC solution to support remote maintenance of AR in logistics transportation. This solution can effectively improve the efficiency of logistics transportation and reduce the maintenance cost. File:Poc1...")
 
No edit summary
Line 17: Line 17:
<p>
<p>
Distributed MEC based AR remote maintenance for logistics transportation
Distributed MEC based AR remote maintenance for logistics transportation
[https://docbox.etsi.org/ISG/MEC/MEC_PoC_TFS_BWM_v0.3.docx MEC PoC TFS BWM]
[https://docbox.etsi.org/ISG/MEC/05-CONTRIBUTIONS/2023//MEC(23)000474r1_MEC_PoC_Distributed_MEC_based_AR_remote_maintenance_for_logi.doc  EC PoC Distributed MEC based AR remote maintenance for logistics transportation]
</p>
</p>


Line 24: Line 24:
This PoC is WORKING on:  
This PoC is WORKING on:  


[[PT03 - MEC Architecture]]
[[WT01- Demonstration of MEC Service Scenarios ]]


[[PT04 MEC enabled vertical segments applications|PT04 - PT04 MEC enabled vertical segments applications]]


== PoC Report ==
== PoC Report ==
PoC Report is expected by end of 2024
PoC Report is expected in Q2 2024

Revision as of 15:25, 14 December 2023

PoC Team

  • China Telecom
  • China Telecom Intelligent NETWORK Technology Co., LTD
  • Huawei

Main Contact

Hongmei Zhu , China Telecom , zhuhongm@chinatelecom.cn

Abstract

This PoC proposal describes the 5G distributed MEC solution to support remote maintenance of AR in logistics transportation. This solution can effectively improve the efficiency of logistics transportation and reduce the maintenance cost.

Poc15.png

PoC Proposal

Distributed MEC based AR remote maintenance for logistics transportation EC PoC Distributed MEC based AR remote maintenance for logistics transportation

PoC Topics

This PoC is WORKING on:

WT01- Demonstration of MEC Service Scenarios


PoC Report

PoC Report is expected in Q2 2024