PoC 4 FLIPS – Flexible IP-based Services: Difference between revisions
From MECwiki
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
<br> | |||
<p class="left" style="font-size:26px;"> ←''[[Ongoing_PoCs|Ongoing PoCs]]''<p> | |||
<br> | |||
== PoC Team == | == PoC Team == | ||
InterDigital | * InterDigital | ||
Bristol is Open | * Bristol is Open | ||
Intracom | * Intracom | ||
CVTC | * CVTC | ||
Essex University | * Essex University | ||
== Main Contact == | == Main Contact == | ||
Alex Reznik, Interdigital [mailto:alex.reznik@interdigital.com alex.reznik@interdigital.com] | * Alex Reznik, Interdigital [mailto:alex.reznik@interdigital.com alex.reznik@interdigital.com] | ||
Dirk Trossen, Interdigital [mailto:dirk.trossen@interdigital.com mailto:dirk.trossen@interdigital.com] | * Dirk Trossen, Interdigital [mailto:dirk.trossen@interdigital.com mailto:dirk.trossen@interdigital.com] | ||
== PoC Demo == | == PoC Demo == | ||
Line 27: | Line 30: | ||
== PoC Proposal == | == PoC Proposal == | ||
[ | [//mecwiki.etsi.org/images/PoC_4_FLIPS_Flexible_IP-Based_Services.docx FLIPS_Flexible_IP_Based_Services] | ||
== PoC Topics == | == PoC Topics == |
Latest revision as of 17:27, 26 March 2024
PoC Team
- InterDigital
- Bristol is Open
- Intracom
- CVTC
- Essex University
Main Contact
- Alex Reznik, Interdigital alex.reznik@interdigital.com
- Dirk Trossen, Interdigital mailto:dirk.trossen@interdigital.com
PoC Demo
PoC Demo 1 - MWC Barcelona, Spain, Feb 2016
PoC Demo 2 - PoC Live Demo using Bristol Is Open network, Bristol, UK, May 2016
PoC Demo 3 - MEC World Congress, Munich (GE), Sept 2016
Abstract
An operator-based MEC Application is designed to transparently accelerate delivery of IP-based content and streaming media. This Application additionally allows exposure of in-network surrogate server to allow operators to offer Surrogate-as-a-Service for web-based media delivery.
PoC Proposal
FLIPS_Flexible_IP_Based_Services
PoC Topics
This PoC is working on:
PT01 - Demonstration of MEC Service Scenarios
PoC Contribution to PT01 and PT02 (Technical Report) is expected by Q4 2016
PoC Report
PoC Report is expected by Q4 2016